City Of Hollywood - FL
Sludge Pump Piping/ Electrical Controls Installation/ Process Controls
Water Treatment Plant Maintenance Package B; Project No. 25- ****
Demolition and installation of process systems and equipment at the City of Hollywood water treatment facility Removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacement of the sodium hexametaphosphate ( SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump; startup, testing, and commissioning
Bid Close Date: