AI helper
The notice is for **** connectors, electrical connectors, and electrical contact information. The material will be used in a crucial shipboard system. The final delivery of material will be on or before 365 days after the effective date of the resulting contract. Submission of certification data CDRLs will be on or before 20 days prior to scheduled delivery. The contractor must prepare and submit a certificate of compliance certifying that the items components furnished under this contract comply with the requirements of the procurement document, including any all invoked specifications and drawings. The contractor must maintain the total equipment baseline configuration. The government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the equipment and its sub assemblies. The contractor must submit an engineering change proposal ecp for any class i or ii changes that impact the equipment covered by this contract. The contractor must maintain adequate records of all inspections and tests. The government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractors facility. The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: contractors name, address and date, the contract purchase order number, the national stock number, lubricants, sealants, anti seize, and or thread locking compounds, certification that o rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub assembly, prior to expiration of the shelf life, manufacturers compound number, when weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this contract, a statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance compliance test performed by name and that it was performed satisfactorily, contractors or authorized personnels signature.
The final delivery of material will be on or before 365 days after the effective date of the resulting contract. final delivery of material will be on or before 365 days after effective date of the resulting contract.
The warranty of supplies of a noncomplex nature is one year from the date of delivery. one year from date of delivery. one year from date of delivery.
Past performance will be considered in the evaluation of offers. avsup wss mechanicsburg will be considering past performance in the evaluation of offers in accordance with dfars **** ****.
The contractor must provide and maintain a quality system in accordance with iso **** as amplified or modified herein. he contractor furnishing items under this contract purchase order must provide and maintain a quality system in accordance with iso **** as amplified or modified herein, with the calibration system requirements of iso **** or ansi **** with iso ****.
The FAT sample s must not be delivered against the contract quantity. he fat sample s must not be delivered against the contract quantity.