Kern High School District
Bakersfield High School: Gymnasium Floor Replacement - The work to be performed shall consist of furnishing all labor, materials, tools, and equipment necessary to complete the removal of the existing resilient gymnasium wood flooring and the installation of new wood flooring to match the existing system at the Bakersfield High School Gymnasium. Work includes surface preparation, sanding, and finishing of the new floor; application of all required game lines, striping, lettering, and the school logo in acco
Bid Close Date: