Rivanna Water & Sewer Authority
IFB No. 434 - Glenmore Water Resource Recovery Facility Blowers, Disinfection and Manual Transfer Switch Improvements- The project consists of the following: Selective demolition, installation of two ( 2) positive displacement blowers; a new canopy over the existing Ultraviolet ( UV) disinfection channel, and a new Manual Transfer Switch ( MTS) with generator plug. The project duration is 12- months.
Bid Close Date: