Lennar
Elm Creek Lift Station Phase 2B Upsizing of existing Elm Creek lift station including a 6& rsquo; diameter wet well, valve vault and appurtenances; 2, 000 lb. capacity jib crane and structural concrete foundation; 6- 8 epoxy lined ductile iron force main and fittings; 15 PVC gravity wastewater pipe, manhole and appurtenances; two submersible non- clog sewage pumps, floats, fittings and appurtenances; electrical improvements and various other site improvements.
Elm Creek Lift Station Phase 2B Upsizing 6 diameter wet well, valve vault and appurtenances, 2, 000 lb. capacity jib crane and structural concrete foundation, 6 8 epoxy lined ductile iron force main and fittings, 15 PVC gravity wastewater pipe, manhole and appurtenances, two submersible non- clog sewage pumps, floats, fittings and appurtenances, electrical improvements and various other site improvements.
Bid Close Date: