Village Of North Freedom
Village of North Freedom - South Maple Street Sewer Relocation- The Project includes the following Work: Installation of wastewater siphon ( depressed sewer) under the Baraboo River. Approximately 330 feet of twin 6- inch high density polyethylene ( HDPE) pipe ( 660 LF total) installed by horizontal directional drilling ( HDD) within a private easement. In addition, 110 feet of 8- inch PVC sanitary sewer and associated siphon inlet and outlet manholes will be installed. A gravel access drive will be constru
Bid Close Date: