This is an Invitation for Bids (IFB) from the City of Rockville, Maryland, for the LED Streetlight Conversion Project Phase 3. The project involves converting existing high-pressure sodium (HPS) streetlights to Light Emitting Diode (LED) technology. Bids are due by 2:00 PM EST on May 13, 2026, and must be submitted electronically via the City's collaboration portal. The project is supported by grant funding from the Maryland Energy Administration and rebates from Pepco's EmpowerMD fund. Contractors must meet minimum qualifications, including five years of experience in streetlight maintenance. The awarded contractor will be responsible for furnishing all labor, materials, equipment, and supervision for the conversion, as well as the safe disposal of removed HPS luminaires. Key requirements include providing specification cut sheets for LED fixtures, ensuring a minimum five-year manufacturer warranty, and meeting specific technical requirements for the LED luminaires such as color temperature, efficacy, and DLC v5. 0 certification. Installation must be performed by a certified electrician, and all work must comply with relevant codes and regulations. The project completion deadline is October 15, 2026. The City reserves the right to increase or decrease quantities and may extend the contract. Liquidated damages will be assessed for delays or failure to meet specific requirements, such as not replacing a luminaire on the same day it is removed or not replacing a faulty luminaire within two working days of notification. A pre-bid conference will be held virtually on April 29, 2026, and is strongly encouraged but not mandatory. Site visits are encouraged independently. Questions regarding the bid must be submitted through the City's collaboration portal by May 7, 2026. The City also encourages opportunities for minority, female, disabled, or veteran-owned businesses (MFDV). All bids must be submitted electronically as a single PDF document. A bid bond of five percent of the total bid amount is required.
The awarded contractor shall complete all work by October 15, 2026.
The City will reject as nonresponsive a bid under this solicitation, which is conditioned on payment of proper invoices in less than thirty 30 days. The City's standard payment terms are Net 30.
The contractor shall pass the material warranty offered by the manufacturer on to the city with no additional cost to the city. The contractor agrees to replace and/or repair without any additional cost whatsoever to the city all portions of any work done by the contractor, if within one year after final acceptance of the project, it is found by the contract administrator to have been installed defectively, performed in any way at variance with the specifications and instructions, or done in a manner contrary to law.
Award will be made to the lowest responsive and responsible bidder complying with all provisions of the invitation for bid, provided the price is reasonable and in the best interest of the City to accept.
At a minimum, bidders must provide written evidence through references of five 5 years prior experience with the scope of work as detailed in the specifications. The contractor must also be a registered Pepco approved service provider or register prior to starting work.
Liquidated damages may be assessed and subtracted from the monies due the contractor in the lump sum amount of $100/day, in case the existing luminaire has been removed by the contractor, but not replaced the same day as required by these specifications. Liquidated damages may also be assessed and subtracted from the monies due the contractor, in the lump sum amount of $100/day, if a faulty luminaire has not been replaced within the 2-day timeline specified in this document. The overall contract completion delay may result in liquidated damages of **** per calendar day.
Individuals interested in viewing the vicinity of the work are encouraged to do so independently, and in a socially distanced manner, prior to the pre-bid meeting. Bidders shall assume complete responsibility and liability for any and all visits.
The contractor is required to provide a demonstration of a few samples before ordering the fixtures to ensure the quality, brightness, and color of the light.
Questions pertaining to this bid may be directed to Lawrence Hall via the City's collaboration portal only at www. ***. *. * no later than 5:00 PM EST May 7, 2026.