Chaves County
Pollution Control
Zuber Draw Site No. 2 EWP The project consists of repairing and reconstructing the auxiliary spillway and restoring overtopped sections of the embankment to their original design dimensions. Work includes excavating and removing eroded alluvium, gullies, and unsuitable materials; constructing and preparing an approved subgrade; furnishing, placing, and compacting earthfill; reconstructing damaged containment dikes; and placing a minimum 6- inch veneer of lime- treated earthfill over the finished auxiliary s
repair and reconstruction of auxiliary spillway and embankment clearing and grubbing, excavation, earthfill, lime? treated earthfill, construction of auxiliary spillway, embankment, traffic control, water for construction, pollution control, removal of water, dewatering, dewatering borrow areas, removal of surface water, construction surveys, mobilization and demobilization