Dept Of Defense- Dept Of The Army- Usace- Lrd- W072 Endist Huntington
Heavy Equipment Repair
**** - Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and Dam - This requirement is to furnish all labor, equipment, and materials to remove the existing Bulkhead Crane bus rail system and furnish and install a new four- bar, 500- amp aluminum bus rail system consisting of three- phase, 480V power with ground, appro
Bulkhead crane bus rails replacement Replacement of existing bulkhead crane bus rail system with a new four- bar, 500- amp aluminum bus rail system ( three- phase, 480v power with ground), approximately 1, 400 feet per bar, including associated hardware, eight new collector shoes, and electrical expansion couplings. Repair or replace approximately 50% of existing protective bus rail covers, supports, and associated hardware.
Bid Close Date: