AI helper
The United States Merchant Marine Academy (USMMA) requires a New York licensed contractor to remove and scrap three steel underground storage tanks (two 20,000-gallon and one 10,000-gallon) containing No. 2 fuel oil. The work includes permanently removing the tanks from service, sealing associated piping, and removing all related wiring and components. The location of the work is Delano Hall and Ohara Hall at USMMA, Kings Point, NY. All work must comply with federal, state, and local laws and regulations, as well as the Secretary of the Interior's Standards for the Treatment of Historic Properties, as the buildings are within a National Historic District. The contractor is responsible for all permits, inspections, labor, materials, disposal costs, and developing a detailed work plan and timeline. A pre-bid onsite walkthrough will be conducted. Responses, including comments on the draft Statement of Work, capability statement, and questionnaire responses, are due by Thursday, May 21, 2026, at 1 PM EST and must be emailed to ***@***. *. * and cc brian. wiley. ctr@dot. gov.
The bid notice states that the completion date is 60 days after award of contract. The bid responses are due by Thursday, May 21, 2026, at 1 PM EST.
The contractor must be a New York licensed contractor and provide all mandatory permits, licenses, and training certificates to conduct tank work per federal, state, and local laws and regulations, including requirements set forth by EPA, DEC, OSHA, and Nassau County Department of Health.
A pre-bid onsite walkthrough with DPW, COR, and Public Safety Department will be conducted to identify and mark the proposed area where removal of tanks and all piping, alarms, and monitoring systems will take place.
The bid notice does not mention the submission of samples.