Umbc - University Of Maryland, Baltimore County - MD
BC- ****- B Cup Primary HTHW Pumps ( Controls) and All Cup HTHW Controls RFP
CUP Primary HTHW Pumps Controls and All CUP HTHW Controls Base Bid: provide an integrated control system to manage and optimize the cup hthw system. the control system shall integrate seamlessly with the existing allen bradley plcs and provide a full graphics package at the cup control room workstation. the new controls system shall make it possible for plant operators to monitor, command and optimize the boilers and associated primary and secondary pumps from the cup control room workstation. all points monitored andor controlled by the legacy siemens system shall be integrated into the proposed new system. a points list is provided in exhibit s. base bid work is not to include the controls and air instrument air work described in the contract documents for project 24 123 central plant primary hthw pumps. Add Alternate 01: provide controls for three primary hthw pumps and instrument air per scope of work outlined in the contract documents for umbc project **** central plant primary hthw pumps. the project i