Sealed proposals due December 7, 2026 at 2:00 PM CST. Contract for municipal pool maintenance including operation, water chemistry, and liner warranty compliance. Requires 3-5 years commercial/municipal pool experience, CPO or AFO certification, 3 references, and itemized cost proposal. Evaluation based on liner protection plan (30%), technical experience (25%), cost (25%), references (15%), climate understanding (5%). One-year initial term with up to four one-year renewals. Insurance required: CGL $1M/$2M, workers comp, professional liability $1M. Proposals valid 90 days.
Proposals must be delivered by December 7, 2026 at 2:00 PM CST. sealed proposals are due to the office of the city secretary by december 7, 2026, at 2: 00 pm cst.
The pool liner has a 10-year manufacturer warranty. failure to maintain compliant water chemistry or operational standards that voids the 10year warranty will render the contractor liable for damages.
Award based on best value. award will be made to the proposer whose proposal is determined to provide the best overall value to the city.
Requires 3-5 years commercial/municipal pool experience and CPO or AFO certifications. minimum of 35 years demonstrating success with commercialmunicipal pool systems and proof of certified pool operator cpo or aquatic facility operator afo certifications.
Contractor liable for damages if warranty voided. if a warranty claim is denied due to verified contractor negligence or improper chemicalphysical care, the contractor will be held financially responsible for repairs or replacement.
Clarification requests due November 30, 2026 at 3:00 PM CST. no further inquiries will be accepted after 3: 00 pm, cst on november 30, 2026.
Late proposals returned unopened. proposals received after this time will be returned unopened. Also, failure to address all requests in summary of qualifications may disqualify.