Dept Of Defense- Dept Of The Army- Amc- Acc- Mission & Installation Contracting Command- 419Th Csb- W6Qm Micc- Ft Drum
Evaporation Baths/ Steam Jet Evaporation/ Air Jet Evaporation
Existent Gum Evaporation Bath 6- Unit 220- 240V 50/60Hz 20. 4A - Existent Gum Evaporation Bath 6- Unit 220- 240V 50/60Hz 20. 4AElectrically heated baths for determining existent gum in aircraft turbine fuels by steam- jet evaporation and in motor and aviation gasolines by air- jet evaporation.
Existent Gum Evaporation Bath 6- unit existent gum evaporation bath, 220- 240V, 50/60Hz, 20. 4A
Bid Close Date: