Health & Human Services Commission - 529 - Texas Comptroller Of Public Accounts - TX
HVAC Installation Services at the San Antonio State Supported Living Center - HHSC PCS is seekingcompetitive bids to establish contract( s) for the installation of four ( 4) VariableRefrigerant Flow ( VRF) units for bldgs. 670 and 671 at the San Antonio StateSupported Living Center. MandatoryOn- Site Visit HHSC will conduct twomandatory on- site visits at thelocation specified below on the date and time identified in the ProcurementSchedule ( cover page of this IFB) or on the date and time established ins
HVAC installation services at the San Antonio State Supported Living Center Installation of four ( 4) variable refrigerant flow ( VRF) units for buildings 670 and 671. The contractor shall complete installations as follows: a. Four ( 4) VRF indoor units, two ( 2) per building. Preferably Samsung VRF units, or an equivalent unit of the same quality which must be approved by the San Antonio SSLC facility. b. Two ( 2) VRF outdoor unit heat pumps, one ( 1) per building. c. Two ( 2) wire controllers, one ( 1) per building. d. Two ( 2) lockbox for thermostat, one ( 1) per building. e. Four ( 4) condensate pumps, two ( 2) per building. f. One ( 1) electrical panel with breaker, to be installed outside of Bldg. 680. g. The contractor shall install four ( 4) total concrete pads for the outdoor condensing units, two ( 2) in each building. The concrete pads shall be 6x6x6 in size.
Bid Close Date: