Commonwealth Of Kentucky - Facilities & Support Services- KY
Rfb- 242- 26 ****, breathitt county
Bid Close Date:
Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** Davis Energy LLC, Permit Number 813- **** Bond Forfeiture Group Proposal will comprise of the following reclamation activities in order to return the permit to permanent program standards: Eight ( 8) slides are actively either moving and/or eroding on the permit and will need to be stabilized by utilizing and installing such items as rock core drains, rock toe buttresses, armored ditches, and regrading slide areas to ensure positive drainage. Seven ( 7) temporary bench ponds exist on the permit and will need to be filled, compacted in 1 lifts, and graded in a manner to create positive drainage to the existing natural outslope. All haul road berms will be removed by grading in place and/or moved to other locations for use as fill material within bench ponds, bare and low areas, and exposed cut areas. Diversion ditches will be removed by grading material to create a smooth transition into the upper slope and then be tracked in. Silt traps and silt checks will be installed within constructed ditches and other needed locations as silt control and as flow dissipaters. Silt barriers, fence or bales, will also be utilized during reclamation activities to prevent and/or reduce off- site silt migration. Revegetation of all disturbed areas will made by uniformly spreading agricultural limestone, by performing seedbed preparations ( tracking), un