AI helper
The City of Alcoa, TN is seeking bids for the construction and installation of improvements to the raw water intake pump station. Bids are due by January 7, 2026, at 2:00 p. m. local time. The project includes replacing a butterfly valve, gate actuator, bar screen, and adding a screen deflector. A prebid conference is mandatory on December 16, 2025, at 10:00 a. m. at the Alcoa Water Treatment Plant. The bidder is responsible for the timely delivery of their bid. The project involves replacing a manually operated butterfly valve at the discharge of one of the raw water intake pumps, replacing the gate actuator of the intake sluice gate, replacing a submerged coarse bar screen at the intake structure, addition of a screen deflector unit, associated electrical work, temporary bypass pumping, and all other associated support work as described within these documents and associated drawings. Work associated with the bar screen replacement shall be conducted in submerged river conditions by a duly licensed and certified diving teamcontractor, along with any necessary river restoration work to mount the new screen to the wall. temporary bypass pumping shall be provided outside the intake pump station building utilizing the river suction source and existing bypass infrastructure discharge on the existing raw water pipeline. the temporary bypass pumping shall be utilized during any proposed system downtime. the work will be completed as defined in the contract agreement. Bidding documents can be requested from engineer and transferred via electronic transfer. Each bid must be submitted on the prescribed bid form and accompanied by bid security as prescribed in the instructions to bidders. Successful bidder will be required to furnish the additional bonds and insurance prescribed in the bidding documents. Bidders are not required to be prequalified by owner to perform the type and size of work contemplated herein. In order to submit a bid, bidders shall comply with the requirements listed in the instructions to bidders. For information concerning the proposed work, please contact : consor engineering: marios georgiou, for security reasons, you must enable javascript to view this email address. , 828 **** representative: david marcum, for security reasons, you must enable javascript to view this email address. , 865 ****.
The bid notice states, he bidder is responsible for the timely delivery of their bid.
The bid notice states, owners right is reserved to reject all bids or any bid not conforming to the intent and purpose of the bidding documents.
The bid notice states, bidders are not required to be prequalified by owner to perform the type and size of work contemplated herein. in order to submit a bid, bidders shall comply with the requirements listed in the instructions to bidders.
The bid notice states, attendance at a prebid conference is a mandatory requirement of submitting a bid for this project. a prebid conference will be held on december 16th, 2025, at 10: 00 a. m. local time at the alcoa water treatment plant, 302 sam houston school road, maryville, tn ****.