Energy Northwest invites bids for wastewater pond liner and leak detection replacement at Columbia Generating Station. Mandatory site visit on October 21, 2026. Questions due October 28, 2026. Bids due November 5, 2026, 1:00 PM local time. Work must be completed by March 1, 2027. Prevailing wage requirements apply. Bid bond of 5% required. Performance and payment bond of 100% required. Contractor must be registered in Washington State. Evaluation considers price and other factors. Optional bid items for dosing pond and main power distribution.
The work must be completed by March 1, 2027. As stated in the bid form: bidder shall complete the work by march 01, 2027.
Monthly invoices may be submitted for work satisfactorily completed. Per the document: contractor may submit a monthly invoice to energy northwest for approval and payment for work satisfactorily completed.
The contract is awarded to the responsible, responsive and qualified bidder with the lowest price, whose bid will be most advantageous to energy northwest, price and any other factors set forth herein considered.
Bidders must meet responsibility criteria including contractor registration, UBI number, workers compensation, and other declarations. As stated: bidder must meet the following bidder responsibility criteria to be considered a responsible bidder.
Failure to execute contract and furnish bonds within 10 days results in liquidated damages. The document states: the bidder shall be considered to have abandoned the bid and the check or bid bond in the amount of 5% of the bid delivered with the bid shall thereupon be due and owing to energy northwest as liquidated damages.
The site visit is mandatory on October 21, 2026 at 1 PM local time. The document states: bidder scheduled and attended the mandatory examination of site is a required criterion.
Protests based on specifications must be received no later than 10 calendar days prior to bid submission. The document states: protests based on the specifications or other terms in the ifb documents which are apparent on the face of said documents must be received by energy northwest no later than 10 calendar days prior to the date established for submittal of bids.
Bids may be rejected if nonresponsive, incomplete, or if bid form is not signed. The document states: if the bid form is not signed, the bid shall be rejected and any exceptions may result in your bid being declared nonresponsive.