City Of Huntington - WV
Coping
2026- 02- 02 REBID Centennial Fire Station Partial Roof Replacement
Partial roof replacement of Centennial Fire Station Asbestos abatement to be performed on roof by contractor, asbestos testing report is attached below. Remove and legally dispose of existing EPDM and insulation. Install by mechanically attaching two 2 layers of 1. 5inch polyisocyanurate insulation to decking with screws and plates. Install tapered insulation between scuppers to create positive water drainage. Fully adhere . 060 EPDM to insulation with manufacturers standard bonding adhesive. Install new through wall scuppers, collector boxes and down spouts shop fabricated from 24ga steel. Shop fabricate and install 24ga steel coping with Kynar finish on parapet walls. Flash all curbs and penetrations with pressure sensitive flashing. Install walkway pads around all HVAC service doors. Contractor will furnish all labor, materials, permits, and remove all trash and debris from jobsite.