Big Bend Lower Brule North Ecosystem Restoration, Element 1 Phase 2, Lower Brule, SD - On or about 10 November 2025, the Government intends to issue the Invitation for Bid ( IFB) for & ldquo; Big Bend Lower Brule North Ecosystem Restoration, Element 1 Phase 2, Lower Brule, SD& rdquo;. & n
z2pc repair or alteration of unimproved real property land lower brule north element 1 phase 2 includes 100 foot wide riparian planting bench, gravel maintenance path along the entire reach 3, stone toe revetment to protect the shoreline from erosion, 2. 12 acre peninsula protected from erosion by a 920 foot long l head dike that would be constructed offshore from the peninsula. the protected open water area between the l head and the peninsula will develop into a 3. 75 acre emergent wetland and this will also create approximately 17 acres of riparian habitat. related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
AI helper
The contractor must complete the work 450 days after receiving the notice to proceed. A site visit will be scheduled. All contractors must be registered and have an active and verified account in the System for Award Management (SAM). Solicitation documents will be posted on SAM. gov. Performance and payment bonds will be required.
The bid notice states, he contractor will be required to commence work upon receipt of contract award and complete the work 450 days after receipt of notice to proceed.
The bid notice states, All contractors must be registered and have an active and verified account in the system for award management sam in order to receive a contract award from any dod activity.
The bid notice states, Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed.
The bid notice states, a site visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via far clause **** 27.
The bid notice states, he estimated construction cost of this project is between 10, 000, 000 and 25, 000, 000.