City Of Novato
Traffic Calming
2026 Annual Pavement Rehabilitation Project The scope of work includes localized digouts, mastic crack sealing, and the application of a high- performance Type II slurry seal. To address segments requiring structural restoration, the project includes precise cold planing of existing pavement followed by a new hot mix asphalt ( HMA) overlay. Additional corridor improvements include the installation of a new Class IV protected bike path, designed to enhance multimodal safety through physical separation. The p
2026 Annual Pavement Rehabilitation Project Localized digouts, mastic crack sealing, high- performance type II slurry seal, cold planing of existing pavement, hot mix asphalt ( HMA) overlay, installation of a new Class IV protected bike path.
Bid Close Date: