Ct State Colleges & Universities - CT
CT State Manchester - New Dental Lab - Bids are due August 21st at 3pm. This CT Source Posting ends after the bids are due on August 28th so that bidding results can be posted. Construction of a new dental laboratory at CT State Manchester. Work includes but is not limited to, cutting the floor slab to run new vacuum, water, air and drain lines to ( 4) dental chairs. Vacuum pump, air compressor, water filter housing and ( 3) existing dental chairs shall be relocated as part of the GCu2019s contract from the
ct state manchester new dental lab bids **** vinyl floor tile and sheet installation service **** pipefitting fabrication service **** hvac ventilation and duct work construction service **** floor leveling service **** electric power system construction service **** exterior insulation and finishing service **** hvac mechanical construction service **** ceramic floor tile installation service **** commercial and office building renovation and repair service **** pipefitting maintenance or repair service **** electrical inspection service **** commercial and office building new construction service **** acoustical and ceiling work service **** building framing service **** cabinet building and installation service **** hvac heating system construction service **** core drilling and cutting service **** concrete pumping service **** building maintenance service **** heating and cooling and air conditioning hvac installation and mai
Bid Close Date: