BidHits uses cookies to provide an individualized service and care for the privacy and protection of shared data.
By browsing this site, we understand that you agree to the terms of our Privacy Policy.
Top Drive Government Bids & RFPs
AI email alerts, regional filters, and access to bid documents
Our AI understands your business and finds more opportunities. - 14-day free trial - no auto-charge.
90% recommend BidHits (967 real users, 11/17/2025).Methodology
****: F550 4X4 Heavy Duty Chassis Crew Cab ( Roller Top Truck Bed) DWSD ONLY: Furnish and deliver fully assembled one and one half ton ( 1 1/2 ton) capacity utility trucks with four- wheel drive, dual rear wheels and heavy- duty chassis, four door Crew Cab with rear bench seat, utility body with roller top truck bed with 185 CFM underdeck PTO drive air compressor per specifications herein.
USA | PA | LUZERNE COUNTY | MOUNTAIN TOP Small City
Mountaintop Area Joint Sanitary Authority, Luzerne County
Glen Summit Collection System Abandonment Project - Bids will be received by Mountaintop Area Joint Sanitary Authority, 290 Morio Drive, Mountain Top, PA ****, for the GLEN SUMMIT COLLECTION SYSTEM ABANDONMENT PROJECT until 2: 00 p. m. ( prevailing time) on December 12, 2025. Bids will be publicly displayed on PennBid by 3: 00 p. m. on December 16, 2025. All documents are available at no cost at PennBid - www. ***. *. * on the Access Projects on the Active Bidding Site then Open Public Opport
glen summit collection system abandonment project
AI helper
The bid is for the glen summit collection system abandonment project. Bids must be submitted by December 12, 2025. A certified check or bid bond in the amount of 10 is required. The successful bidder will need to furnish performance and payment bonds in the amount of 100 of the contract. PA prevailing wage applies.
The bid notice states that the deadline for submissions is dec 12th 2025, 2: 00 pm est.
The bid notice states that the deadline to submit questions is dec 5th 2025, 5: 00 pm est.
**** Mobilization: All labor and materials necessary to accomplish preparatory work and operations, including those necessary for movement of personnel, equipment, supplies and incidentals to the project **** Rebuild Catch Basin: All labor and materials needed to remove and rebuild existing catch basin that is located between the sidewalk and roadway. Work shall include removing existing catch basins, pouring new bottoms, and rebuilding walls, sealing around pipes where they enter the catch basin interior and exterior. The existing frame, grate, and steal top may be re used if it is all intact. All work shall be done in accordance with LA DOTD Standard Specifications for Roads and Bridges. Latest edition all debris is to be removed at no direct pay. 706 Remove/Replace Concrete Driveway 6 24 hr High Early: All labor, materials, equipment and supervision necessary to, in accordance with these specifications, remove/replace concrete driveway in accordance with LA DOTD Standard Specifications for Roads
AI helper
The contractor must provide all labor, materials, equipment, and supervision for the project. The contractor is responsible for all injuries to persons and damages to property. The contractor must provide a performance surety bond. The parish reserves the right to make changes to the work.
Monthly certificates for partial payment, in a form approved by the parish, shall be transmitted to the parish upon receipt from the contractor and acceptance by the parish. When the contract price is less than five hundred thousand dollars 500, 000, these certificates shall be equal to ninety percent 90 of both the work performed and materials stored at the site.
The contractor warrants that all materials and equipment will be new unless otherwise specified and that all work will be of good quality and free from faults or defects and in accordance with the requirements of the contract documents. All unsatisfactory work, all faulty or defective work and all work not conforming to the requirements of the contract documents at the time of acceptance shall be considered defective.
Failure to complete or deliver within the time specified or to provide the services as specified in the bid or response will constitute a default and may cause cancellation of the contract. Where the parish has determined the contractor to be in default. the parish reserves the right to purchase any or all products or services covered by the contract on the open market and to charge the contractor with the cost in excess of the contract price.
Each respondent shall visit the site of the proposed work and fully acquaint itself with all surface and subsurface conditions as they may exist so that it may fully understand this quote request. Respondent shall also thoroughly examine and be familiar with drawings, specifications, and contract documents.
Samples of materials furnished under the contract shall be submitted for approval to the parish when and as directed. Whenever a material or article required is specified or shown on the plans by using the name of a proprietary product or of a particular manufacturer or contractor, any material or article which shall perform adequately the duties imposed by the general design will be considered equal, and satisfactory, providing the material or article so proposed is of equal substance and function and that all technical data concerning the proposed substitution be approved by the parish prior to the submission of a quote.
RFQ **** Construction Services For FT. Myer Drive Sidewalk Widening and Signal Upgrade- The county is seeking a qualified contractor to furnish all labor, materials, and equipment for the construction services of a sidewalk widening project in between Langston Blvd WBL and EBL along Ft Myer Dr. This includes work over top of the I- 66 tunnel, which requires a non- standard sidewalk section shown in the details ( the âProjectâ), and all other work shown, described, and required by the Contract Documents ( h
PURCHASE AND INSTALL OF MULTIPLE COMPONENTS ON A 2025 FORD F- 350 - REQUIREMENT This requirement is for to perform necessary repairs on a, 2025 FORD F350 ( Tag number ****, VIN# ****). All equipment must be covered by the manufacturer s warranty. All items shall include standard warranty
Purchase and install of multiple components on a 2025 Ford F350 60inch CA cab to axle front winch, mount, guard, lights, Warn winch and mount, Warn16. 5 winch, Warn PN **** winch mounting bracket, Warn PN **** winch carrier, Warn PN **** winch guard, Warn PN **** light bar, LED 2 row light bar approximately 20 inches wired to upfitter switches, LED amber strobe mounted in front grill and rear of utility bed wired to upfitter switch, Go light mounted on driver side on material rack, two remotes, LED lights, body mounted work lights, LED light mounted at rear of utility bed, gooseneck hauler utility body, body CM brand TM body or equal spring mounted front mount, 1st front vertical compartment, 2each 8 inch tall heavy duty slide out drawers mounted at bottom of bin, 3 16th floor deck, compartment lights in each bin, utility box compartment lighting in floor tiedown, e track bed liner, additional storage boxes on top side of PS and CS of first vertical bin, full length first vertical bin, full width first
AI helper
This is a combined synopsis/solicitation for the purchase and installation of components on a 2025 Ford F350. The government will evaluate quotes based on the lowest price technically acceptable (LPTA) process. The offeror should submit their best terms and/or their most favored customer pricing in their initial offer. The quote must be itemized and detailed with individual and total parts prices, labor time, and all paint labor if applicable. Quote is to include all fees, including shipping or freight costs and provide the estimated ETA, number of days delivery can be expected after receipt of purchase order. All vendors submitting quote must have repair facility within 75 miles of agency operating the vehicle located at, , fort collins, co **** shall be completed no later than 120 days after receipt of order (ARO). Invoices for services may only be submitted after the goods are delivered, inspected and accepted unless otherwise approved by the gsa contracting officer.
The bid notice states delivery shall be completed no later than 120 days after receipt of order aro.
The bid notice states payment will be made via government purchase card mastercard.
The bid notice states all equipment must be covered by the manufacturers warranty. all items shall include standard warranty.
The bid notice states he government will evaluate quotes based on the lowest price technically acceptable lpta process.
The bid notice states all vendors submitting quote must have repair facility within 75 miles of agency operating the vehicle located at, , fort collins, co ****.
Set it and forget it: enable government bid alerts in 3 steps
1
Choose the keywords
Add words related to your products or services. Our AI broadens the search so you don't miss opportunities.
2
Sign up and receive by email
Start the 14-day free trial and receive alerts with links to bid documents or the official posting.
3
Adjust if needed
Add or edit keywords, set regions, choose your email delivery schedule and email style. Map view available in the dashboard.
What our users say
90% recommend BidHits (967 real users, 11/17/2025).Methodology
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
R. M. Ferreira
It is complete and optimal, it improves my time.
R. de L. Cruz
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
J. Comunale
Great recommendations appear. Having the bid process link right in the email body helps a lot and saves time.
V. Kafka
The email alert is amazing. I really liked the speed — the bid notices arrive by keywords directly in my inbox, which makes searching much easier. I only need to focus on the other processes, which is a big relief.
We selected the most helpful reviews from real users. Order may change periodically.
I’m absolutely delighted with the system’s performance so far. This software has exceeded all my expectations, ensuring that no crucial keyword, such as “cathodic protection” and others related, goes unnoticed. Its precision and efficiency are remarkable, providing extra peace of mind in our operations. I’m truly impressed by its effectiveness.
S. I. B. Pinheiro
I liked it — very easy to navigate. It’s the best one I’ve found.
T. Brasil
I’m notified immediately about every bid that opens in my area. It really helps my work.
E. Goncalves
The system is very practical. It’s helped increase my monthly revenue.
F. H. Silva
I quickly find the bids that interest me.
S. Roque
They update me the same day things are published, so I don’t have to check every public agency’s website.
L. C. De Moura
Easy to find the bids.
R. M. David
Speed: ongoing bids are posted in a timely manner.
M. Araujo
Speed, ease and accessibility. Even though I'm a new user, I notice this.
A. de A. S. Silva
Very practical and the information is provided in a timely manner.
I. P. Silva
Easier deal-making.
A. Boeng
I’m very satisfied — you’re doing an excellent job. You send the bids by email at perfectly scheduled times.
BidHits is a public bid search engine. We map official portals daily and deliver results on the site and by email. Our AI understands your business so you don't miss opportunities.
Just enter your email and activate the trial. For 14 days you can use all features. When it ends, if you don't subscribe at /subscription.php, the bid list becomes limited and you won't be charged automatically.
1) Choose keywords (your products or services). 2) Activate the trial and start receiving. After signup you can adjust regions, times, and email style on the settings page.
Whenever possible, yes. Some official portals require login or block direct links; in those cases we point you to the official process page so you can download the documents.
Yes. In the bids panel you can filter by region, procurement method, dates, and value ranges. In settings you can save preferences for future alerts and searches.
Yes. After signup you can switch to the map in the panel and see bids by location.
AI can make mistakes. It's trained to understand your business based on the keywords you add. Refine by adding specific terms, modifying or deleting those that produce off-topic results. That trains your feed and improves future alerts.
Yes. You can query contracts via API. Documentation at /api_integration.php. Ideal for CRM, BI and automations.
In Settings you can pause alerts or adjust delivery times. If you want to delete your account, just contact us. During the free trial there's no auto-charge.
We monitor major official portals every day at the federal, state, and local levels. Bid notices are added to the system as soon as they are published on the source portal.
Plans start at $ 39.00/month. Start with the free trial--no auto-charge.
Explore a term, enable AI email alerts, access bid documents or the official posting, and filter by region and method.
Transcript
Welcome to BidHits. Start by adding a few key words. Just type what you sell.
That's it. You're now ready to explore government contract opportunities made for you. Your bidding dashboard shows the latest tenders organized by date and matched to your keywords.
To help you spot the most relevant ones, your keywords are automatically highlighted in yellow.
And here's the best part. Our AI is always working behind the scenes to bring you even more opportunities.
Smart Search is already on, enhancing your results beyond exact matches. You don't have to do a thing.
Each tender card comes with useful tools. You can view a summary, open documents, favorite tenders, write private notes, remove what doesn't fit, or check the location on the map.
You can also see all tenders from the same day in a single map view. Perfect for planning your next steps. Use the search bar, apply filters, and explore with ease.
Try BidHits now. It's fast, smart, and free to get started.
AI Assistant
Ask me about the bid...
Loading summary...
Methodology
Unaided survey with 967 active users, conducted through 11/17/2025.
Single question: "Would you recommend our services to a friend or colleague?" - 90% answered "yes".