Newtown Township is seeking engineering consulting firms for a multiuse trail project. Services include planning, survey, environmental review, design, and construction phase support. The project involves a shared-use path connecting SR 252 to SR 3 through an easement on Dunwoody Village property. Key considerations include ADA accessibility, environmental sensitivities, and coordination with various stakeholders. Submittals are due by August 28, 2026, 2:30 PM, via email to ***@***. *. * are due by August 19, 2026.
Submittals are due by Friday, August 28, 2026, no later than 2:30 PM. all submittals need to be submitted by email no later than 2:30pm on august 28, 2026.
The selection will be based on a combination of price for outlined items, schedule of work, and quality of work submitted with the price quote. the successful respondent will be identified by a combination of: 1 price for outlined items 2 schedule of work and 3 quality of work submitted with price quote.
Firms must demonstrate qualifications and relevant project experience in shared-use path trail design, easement corridor projects, environmental permitting, ADA-compliant infrastructure, and at-grade crossing design. Resumes of key personnel are required. Firm qualifications and relevant project experience for the prime consultant and all subconsultants, with emphasis on: shareduse path trail design, environmental permitting, ada compliant pedestrian and bicycle infrastructure, and atgrade crossing design on state and us routes.
While not explicitly stated as mandatory or optional, the document mentions that any firm visiting the site needs to be respectful of private property. Any firm visiting the site needs to be respectful of private property by not trespassing, etc.
Disqualification may result from failure to adhere to general requirements, submission after the due date, submission in a format other than PDF, or any material misrepresentation. Failure to adhere to the general requirements attached to the advertisement. Submission after 4:30pm on the applicable due date. Submission in a format other than pdf. Any material misrepresentation in the soi.