Lot 1: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 2: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 3: Materials to demolish the existing mobile home/stick built structure, including slab, foundation, porches and decks - Approx. . 1, 904 SF Remove all trash & construction debris to an approved Land Fill. Burning is not allowed. Demolition & Disposal shall be done Per DHEC, OSHA and Pollution Control Regulations.
Lot 4: Labor to demolish the existing mobile home/stick built structure, including slab, foundation, porches and decks- Approx. . 1, 904 SF Remove all trash & construction debris to an approved Land Fill. Burning is not allowed. Demolition & Disposal shall be done Per DHEC, OSHA and Pollution Control Regulations.
Lot 5: Materials to demolish and dispose of outbuildings to include slabs ( foundation). Dispose of in an approved landfill.
Lot 6: Labor to demolish and dispose of outbuildings to include slabs ( foundation). Dispose of in an approved landfill.
Lot 7: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 8: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 9: Materials to provide for Permits ( DHEC & Local) Manifest records to be made available upon request
Lot 10: Credit For Salvaged Items - to be determined
Lot 11: Description UOM Qty Demolition- 11
Lot 12: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 13: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 14: Materials to demolish the existing stick built home structure with attached mobile home, including all cmu piers, footers and exterior decks- Approx. . 4, 304 SF Remove all trash & construction debris to an approved landfill. Burning is not allowed. Demolition & disposal shall be done per DHEC, OSHA and Pollution Control Regulations.
Lot 15: Labor to demolish the existing stick built home structure with attached mobile home, including all cmu piers, footers and exterior decks- Approx. 4, 304 SF Remove all trash & construction debris to an approved landfill. Burning is not allowed. Demolition & disposal shall be done per DHEC, OSHA and Pollution Control Regulations.
Lot 16: Materials to demolish the existing single- wide mobile home structure directly behind the main structure to include all piers, tie downs and decks. Dispose of in an approved landfill.
Lot 17: Labor to demolish the existing single- wide mobile home structure directly behind the main structure to include all piers, tie downs and decks. Dispose of in an approved landfill.
Lot 18: Materials to remove and dispose of all trash and debris from lot. Dispose of in an approved landfill.
Lot 19: Labor to remove and dispose of all trash and debris from lot. Dispose of in an approved landfill.
Lot 20: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area
Lot 21: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area
Lot 22: Permits ( DHEC& Local) Manifest records to be made available upon request
Lot 23: Credit for Salvaged Items to be determined
Lot 24: Description UOM Qty Demolition- 23
Lot 25: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks& plumbing Per DHEC regulations.
Lot 26: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells septic tanks& plumbing Per DHEC regulations
Lot 27: Materials to demolish and dispose of the existing mobile home/stick- built structure, including piers and footers- Approx. . 4, 418 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations.
Lot 28: Labor to demolish and dispose of the existing mobile home/stick- built structure, including piers and footers- Approx. 4, 418 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations.
Lot 29: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area
Lot 30: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area
Lot 31: Permits ( DHEC& Local) Manifest records to be made available upon request
Lot 32: Credit for Salvaged Items to be determined
Lot 33: Description UOM Qty Demolition- 31
Lot 34: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks& plumbing Per DHEC regulations.
Lot 35: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks& plumbing Per DHEC regulations.
Lot 36: Materials to demolish the existing stick- built home with attached carport, including piers, foundation, footers, slab and exterior porches- Approx. . 1, 440 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations.
Lot 37: Labor to demolish the existing stick- built home with attached carport, including piers, foundation, footers, slab and exterior porches- Approx. 1, 440 SF Remove all trash and construction debris to an approved landfill. Burning is not allowed. Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations.
Lot 38: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 39: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area
Lot 40: Permits ( DHEC& Local) Manifest records to be made available upon request
Lot 41: Credit for Salvaged Items to be determined
Lot 42: Description UOM Qty Abatement- 39
Lot 43: Materials to remove & dispose of the roof coating material that contains asbestos- Approx. . 780 SF Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details.
Lot 44: Labor to remove & dispose of the roof coating material that contains asbestos- Approx. . 780 SF Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details.
Lot 45: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks& plumbing Per DHEC regulations.
Lot 46: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks plumbing Per DHEC regulations.
Lot 47: Materials to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments- Approx. . 780 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 48: Labor to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments- Approx. . 780 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 49: Materials to grade any disturbed ground due to demolition activities, and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 50: Labor to grade any disturbed ground due to demolition activities, and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 51: Permits ( DHEC & Local) Manifest Records to be made available upon request
Lot 52: Credit for salvaged items. To be determined.
Lot 53: Description UOM Qty Demolition- 49
Lot 54: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 55: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 56: Materials to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, & exterior decks/porches- Approx. 984 SF. Remove all trash and construction debris to an approved Land Fill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 57: Labor to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, & exterior decks/porches- Approx. . 984 SF Remove all trash and construction debris to an approved Land Fill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 58: Materials to demolish & dispose of the outbuilding, approximately 6' X 10'
Lot 59: Labor to demolish & dispose of the outbuilding, approximately 6' X 10'
Lot 60: Materials to demolish & dispose of fencing on property
Lot 61: Labor to demolish & dispose of fencing on property
Lot 62: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 63: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed ( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 64: Permits ( DHEC & Local) Manifest Records to be made available upon request
Lot 65: Credit For Salvaged Items. To be determined.
Lot 66: Description UOM Qty Demolition- 61
Lot 67: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 68: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 69: Materials to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, footers & exterior decks/porches- Approx. . 1, 352 SF. Remove all trash and construction debris to an approved landfill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 70: Labor to demolish the existing DBL. wide mobile home structure. Include all cmu piers, tiedowns, footers & exterior decks/porches- Approx. . 1, 352 SF. Remove all trash and construction debris to an approved landfill. Burning is not allowed . Demolition and disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 71: Materials to demolish & dispose of the outbuilding, approximately 8' X 10'
Lot 72: Labor to demolish & dispose of the outbuilding, approximately 8' X 10'
Lot 73: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 74: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 75: Permits ( DHEC & Local) Manifest Records to be made available upon request
Lot 76: Credit for salvaged items. To be determined.
Lot 77: Description UOM Qty Abatement- 71
Lot 78: Materials to remove & dispose of the roof coating material that contains asbestos- Approx. . 684 SF . Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details.
Lot 79: Labor to remove & dispose of the roof coating material that contains asbestos- Approx. . 684 SF . Removal and disposal shall be done per DHEC & EPA guidelines by certified and licensed personnel. See attached asbestos report for details.
Lot 80: Materials to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 81: Labor to demobilize all utilities - water/sewage/electric prior to demolition. Seal off all wells, septic tanks & plumbing Per DHEC regulations.
Lot 82: Materials to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments- Approx. . 684 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 83: Labor to demolish the existing single wide mobile home structure. Including piers, tie downs and exterior attachments- Approx. . 684 SF. Remove all trash & construction debris to an approved landfill. Burning is not allowed . Demolition and Disposal shall be done per DHEC, OSHA and Pollution Control Regulations
Lot 84: Materials to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 85: Labor to grade any disturbed ground due to demolition activities and seed affected area. Stabilize seed with wheat straw or equivalent. Finished grading work shall be smoothed( no deep rutting) and free from debris. Final stabilization requires 70% vegetative coverage of disturbed area.
Lot 86: Permits ( DHEC & Local) Manifest Records to be made available upon request
Lot 87: Credit for salvaged items. To be determined.