Commonwealth Of Kentucky - Facilities & Support Services- KY
RFB- 235- 26 Exum Center Exterior Repairs KSU
Bid Close Date:
Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** Kentucky State University, Exum Center Exterior Repairs project is being undertaken to extend the usable life of the building and to maintain the weather resistance while modernizing the exterior appearance. The faade is showing many signs of decay, as there are many visible areas of cracking in the brick, ground face CMU and architectural precast concrete shapes ( sills, water table and other miscellaneous segments). The exterior insulation finish system ( EIFS) has several areas showing decay and even has large sections missing at several locations around the building. In addition, the main entrance canopy has significant signs of decay including rust of the structural steel and downspouts; deteriorating EIFS; and missing canopy ceiling. To stay within the project budget and to address the focal areas of the building, the scope of work will be limited to the renovation of the main faade, replacement of the entrance canopy, updating the front plaza and the urgent repairs around the remaining exterior of the building. At the front faade of the building, the damaged masonry will be repaired and the entirety of the EIFS will be replaced with a modern metal wall panel assembly. The big box of the gymnasium will be utilized for signage. The entrance canopy will be replaced in its entirety with an updated modern design along with the plaza sur