Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e-
procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e-
procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** The project consists of work on 2 separate
buildings. The scope of work at the Main
Kitchen building consists of the existing shingle roof removal down to the deck and the installation of a new standing seam
metal panel roof system. New gutters & downspouts are required as noted. The scope of work at the Connector
Building consists of the complete removal of the existing ballasted EPDM membrane roof, down to the
metal roof deck, and the installation of a new insulated 2- ply mod- bit ( cold application over hot application) roof system on 4 separate roof areas. New pre- finished
metal coping caps are specified for 2 of the areas. New gutters & downspouts are specified for one of the roof areas, the others drain via scupper drains. EIFS repairs to be performed as noted.