Bids must be submitted by March 3, 2026, at 3:30 PM ET. Documents will be available for download on January 28, 2026. Bidder prequalification is required. Notice of intent to protest the bid specifications must be filed within 72 hours after posting. Formal written protest must be filed within ten days after the 72-hour period ends.
The bid submittal is due no later than 3:30 PM ET, Tuesday, March 3, 2026, to the address provided. bid submittal due date: nbsp no later than 3: 30 pm et, tuesday, nbsp march 3, 2026, nbsp to the below address: florida department of environmental protection, bureau of design and construction, **** commonwealth boulevard, ms 520, tallahassee, florida, **** ****, attention: alisha sadler, bureau of design and construction, 850 245 ****.
Each bidder shall provide a copy of its biennial pre qualification letter from FD&EPS Bureau of Design and Construction. If not pre qualified, the bidder must submit a current state contractor license certification or registration and current corporate charter registration with the bid.
Notice of intent to protest the bid specifications must be filed within 72 hours after bid specifications are posted. otice of intent to protest the bid specifications must be filed with received by the agency clerk, lea crandall, department of environmental protection, office of general counsel, **** commonwealth boulevard, ms 35, tallahassee, florida, **** ****, 850 245 ****, fax 850 245 ****, ***@***. *. *, during the 72 hour period after bid specifications are posted on the vendor bid system.