Lot 1: Mobilization ( max 5% of bid)
Lot 2: Remove & replace existing wood fence ( at connections)
Lot 3: Remove existing screening wall including grade beam and piers ( 2' below grade beam)
Lot 4: Remove and replace existing alley pavement
Lot 5: Remove existing concrete driveway
Lot 6: Remove existing curb inlet
Lot 7: Cut & plug existing 18" rcp
Lot 8: Remove & salvage existing entry feature hardscape stones
Lot 9: Remove existing landscape at entry features
Lot 10: Remove & replace sidewalk ( unavoidable damage)
Lot 11: Screening wall ( single wythe - brick) ( 6' height)
Lot 12: 18" reinforced concrete drilled shaft foundations
Lot 13: Reinforced concrete grade beam
Lot 14: Construct triple gate alley combination inlet
Lot 15: Connect new 18" rcp to existing 39" storm pipe
Lot 16: 18" class iii storm pipe
Lot 17: 6" topsoil & block sodding
Lot 18: Erosion control measures plan & implementation
Lot 19: Traffic control plan & implementation
Lot 20: Trench safety ( including trench safety design)
Lot 21: Install, maintain and remove temporary construction chain link fence ( 6' tall) with privacy netting