South Coast Water District
JRWSS JTM Unit 3 Reach 6 Relocation Ritz Pointe Drive to Niguel Road Construct approximately 655 linear feet of 36- inch welded steel water transmission pipe and approximately 58 linear feet of 30- inch welded steel water pipe and all appurtenances thereto, construct new concrete valve vault, install owner- furnished 30- inch ball valve in new vault, construct valve vault site improvements, construct manway vault and blowoff drain and site improvements, repair and restripe AC pavement and traffic signal loo
project title jrwss jtm unit 3 reach 6 relocation ritz pointe drive to niguel road construct approximately 655 linear feet of 36inch welded steel water transmission pipe and approximately 58 linear feet of 30inch welded steel water pipe and all appurtenances thereto, construct new concrete valve vault, install ownerfurnished 30inch ball valve in new vault, construct valve vault site improvements, construct manway vault and blowoff drain and site improvements, repair and restripe ac pavement and traffic signal loops, replace concrete flatwork, relocate irrigation improvements, repair landscaping, construct connections from new water transmission main to existing water transmission main, miscellaneous demolition, abandon existing 36inch steel water transmission main and vaults in place at locations shown within the city of laguna niguel and the city of dana point.
Bid Close Date: