Interior, Department Of The- National Park Service- Ser North Mabo ( 53000)
N-- Fort Pulaski - VC ELECTRICAL DISTRIBUTION UPGRADE - Amendment 2 is issued to post revised Statement of Work Dated 7/8/2026. Due Date is extended to 7/17/2026 at 5pm EDT. Amendment 1 is issued to post questions and answers, and schedule additional site visit for Monday, 6/29 from 10 am to 11 a
Electrical Distribution System Upgrade Replacement of existing deteriorated electrical service equipment, installation of new code- compliant service equipment with generator interconnection capability at the Fort Pulaski Visitor Center Pump House, removal of existing corroded service disconnect enclosure, fuse blocks, damaged conduits, fittings, and noncompliant or abandoned conductors, disposal of removed materials, implementation of erosion and sediment control measures, furnishing and installation of a service entrance rated manual transfer switch, provision of a stainless steel transfer switch enclosure, installation of new service conductors, replacement or installation of conduit, provision of a generator inlet, provision and installation of a generator receptacle/inlet, ensuring mechanical interlock for the transfer switch, installation or upgrade of grounding electrode system, testing of transfer switch operation, coordination with Georgia Power for outages, lockout/tagout, and reenergization, rest
Bid Close Date: