The contractor must perform general construction, alterations, and repairs to correct fire life safety issues at the Hampton VA Medical Center. The performance period is 365 calendar days. A mandatory site visit is scheduled for August 27, 2026, at 10:00 am EDT. Proposals are due on or before September 21, 2026, at 11:00 am. The contract is a competitive best value tradeoff source selection. The estimated construction magnitude is between $2,000,000 and $7,000,000.
The contract period is 365 calendar days, with the base period beginning **** and ending **** period: base pop begin: **** pop end: ****
The government intends to award to the responsible offeror whose proposal is determined to be the best value to the government, considering price and other factors. the government intends to award one 1 contract to the responsible offeror whose proposal is responsive to the solicitation and determined to be the best value to the government
Offerors must provide a minimum of three and a maximum of five references for experience, with a minimum threshold of projects exceeding $1,000,000. offerors must provide a minimum of three 3 and a maximum of five 5 references of their choice of completed projects, similar in size and scope minimum threshold: projects where the principal objective was repairing and replacing fire and life safety issues for hospitals within the united states, with a total contract value exceeding 1, 000, 000.
A site visit is scheduled for August 27, 2026, at 10:00 am EDT, meeting at the B27 loading dock area. a site visit will be conducted on august 27, 2026, at 10: 00am eastern daylight time edt.
Requests for information questions are due no later than September 3, 2026, by 1:00 pm EDT. request for information questions are due no later than: september 3, 2026, by 1: 00 pm edt.
Failure to meet a requirement may result in an offer being determined unacceptable. failure to meet a requirement may result in an offer being determined unacceptable.
The estimated magnitude of construction is between $2,000,000 and $7,000,000. the estimated magnitude of construction is between 2, 000, 000 and 7, 000, 000.
The contractor must be found responsible, having adequate financial resources and the ability to comply with the required performance schedule. prior to award, the contractor will need to be found responsible with regard to the following items, in addition to evaluation of the offerors proposal.