Trinity River Authority Of Texas
Trinity River Authority of Texas â CRWS Onsite Storage and Equalization Basins Rehabilitation The project scope includes, but is not limited to, the following major work items: Structural improvements and rehabilitation at Equalization Basin ( EQB) Nos. 1- 6; Replacememt of an 18- inch drain line, butterfly valve and appurtenances in Valve Vault 3D ( VV# D), in addition to replacement of 18- inch piping and a new manhole downstream of the vault; Installation of manual water cannons and replacement of W3 wat
trinity river authority of texas â crws onsite storage and equalization basins rehabilitation structural improvements and rehabilitation at equalization basin eqb nos. 1 6 replacememt of an 18 inch drain line, butterfly valve and appurtenances in valve vault 3d vv d, in addition to replacement of 18 inch piping and a new manhole downstream of the vault installation of manual water cannons and replacement of w3 water piping and appurtenances at eqb nos. 1 6 replacement of two 72 inch butterfly valvles and actuators upstream of he eqb nos. 1 amp 2 and 3 amp 4 splitter boxes, along with installation of new access manways replacement of four 60 inch butterfly gates with 60 inch slide gates and electric actuators at the eqb nos. 1 amp 2 and 3 amp 4 splitter boxes, along with associated electrical improvements structural improvements and rehabilitation at the onsite storage basin ossb improvements to the basin cleaning system at the ossb, including replacement of the existing five butterfly gates on the ossb partit
Bid Close Date: