The San Diego National Wildlife Refuge Complex requires the removal of two existing outdoor drinking fountains and the installation of one ADA-compliant outdoor drinking fountain with an integrated bottle refill station. The contract includes labor, materials, equipment, and incidentals. The period of performance is 91 calendar days from June 19, 2026, to September 18, 2026. A site visit is mandatory on June 3, 2026. Questions deadline is June 4, 2026. Proposals are due by June 19, 2026. The construction magnitude is estimated between $5,000 and $11,000. This is a total small business set aside. Payment and performance bonds will be required for awards over $35,000.
The period of performance is from June 19, 2026, to September 18, 2026.
The contractor shall provide warranty documentation and operation/maintenance information at project completion. confirmation of ada compliance and manufacturer warranty information.
Award will be made to a responsible source based on price. he basis of contract will be on price, as acceptability for this requirement below.
Contractors must be registered at the System for Award Management (SAM) website and demonstrate experience in installation and construction of water fountains in accordance with all state and local laws in California. he contractor must show within the proposal relevant to installation and construction of water fountain purchased experience demonstrates the ability to successfully complete as follows all state and local law provides appropriate within the state of california.
A site visit is mandatory on Wednesday, June 3, 2026, from 8:00 am to 12:00 pm PST. site visit: wednesday, june 3, 2026, from 8:00 am to 12:00 pm pst
Questions deadline is Monday, June 4, 2026, at 12:00 pm PST. question deadline date: monday, june 4, 2026 @12:00 pm pst
Failure to be registered in SAM. gov by the award decision time or failure to submit required bonds could lead to disqualification. in order to have a quote considered for award, respondent must be registered at the system for award management sam website https:www. sam. gov as an active vendor by the time an award decision is necessary.
The construction magnitude is estimated to be between $5,**** and $11,****. he construction magnitude is estimated to be between 5, 000 to 11, ****.