Baxter & Woodman Inc. - IL
Water Treatment
City of McHenry - Water Plant # 5 - The Project includes the following Work: Construction of an approximately 3, 000 sf building on a 1- acre site to serve as a 500- gpm water treatment plant, including brick and CMU wall construction, concrete slab on grade with backwash basin, wood truss roof, steel roof panels, horizontal pressure filter, sodium hypochlorite chemical feed system, orthophosphate chemical feed system, fluoride chemical feed system, bathroom, HVAC, electrical and automation, site piping imp
Water treatment plant construction Construction of a 3, 000 sf building for a 500 gpm water treatment plant, including brick and cmu wall construction, concrete slab on grade with backwash basin, wood truss roof, steel roof panels, horizontal pressure filter, sodium hypochlorite chemical feed system, orthophosphate chemical feed system, fluoride chemical feed system, bathroom, hvac, electrical and automation, site piping improvements, natural gas fueled generator, chain link perimeter fencing and gate, surface restoration.
Bid Close Date: