Weber School District
BONNEVILLE HIGH SCHOOL ROOF TOP UNIT REPLACEMENTS Weber School District is requesting bids for two roof top units for Bonneville High School. These units are DX and Steam Heat with a steam heat coil. One unit is an onld Pace unit. The other is a Mammoth. Units must fit current air flow. With heat and cooling load to be field verified. Units must be built to fit existing curb. Units must be able to be delivered to the location by June 1, 2026. A Mandatory job walk by appointment only. Job walks will be avail
Bid Close Date: