Lot 1: Clearing and grubbing
Lot 2: High density polyethylene ( hdpe) pipe ( 12")
Lot 3: Traffic stripe ( plural- component) ( 24" wide)
Lot 4: Construction staking ( construction survey)
Lot 5: Mobilization ( sp)
Lot 6: Structure removal ( basketball goal)
Lot 7: Structure removal ( tree)
Lot 8: Structure removal ( bench)
Lot 9: Structure removal ( playground) ( draper park)
Lot 10: Pavement removal ( asphalt)
Lot 11: Pavement removal ( concrete)
Lot 12: Sidewalk removal
Lot 13: Curb and gutter removal
Lot 14: Concrete sidewalk
Lot 15: Curb and gutter
Lot 16: Temporary silt fence
Lot 17: Solid slab sodding
Lot 18: Accessible 8' table and 5' benches
Lot 19: 6' surface mount bench
Lot 20: 6' surface mount table and benches
Lot 21: Shade structure ( 20' x 20' square pavilion)
Lot 22: Park rules sign
Lot 23: Concrete vehicular pavement
Lot 24: Barbecue grill
Lot 25: Post tension concrete slab
Lot 26: Removal ( gravel)
Lot 27: Playground & surfacing ( complete in place) ( draper park)
Lot 28: Community park sign ( complete in place) ( draper park)
Lot 29: Tree protection fencing
Lot 30: Wood fence bathroom enclosure ( complete in place)
Lot 31: Ada ramp
Lot 32: Maintenance crossing
Lot 33: W11- 2 ( blinking) sign with w16- 7pr plaque
Lot 34: Pedestrian bridge ( complete in place) ( draper park)
Lot 35: Earthwork ( draper park)
Lot 36: Description UOM Qty ****
Lot 37: Structure removal ( post and cable fence)
Lot 38: 12' pipe and rail gate
Lot 39: Pipe and rail fence
Lot 40: Maintenance crossing
Lot 41: Description UOM Qty 823. A
Lot 42: Concrete sidewalk
Lot 43: Solid slab sodding
Lot 44: Basketball/futsol court surface coating & equipment ( complete in place ( draper park)
Lot 45: Description UOM Qty
Lot 46: Clearing and grubbing
Lot 47: Fog seal
Lot 48: Construction staking ( construction survey)
Lot 49: Mobilization ( sp)
Lot 50: Structure removal ( bleachers)
Lot 51: Structure removal ( shade structure)
Lot 52: Structure removal ( soccer goal)
Lot 53: Structure removal ( backstop)
Lot 54: Structure removal ( okc spraygrounds sign)
Lot 55: Structure removal ( bollard)
Lot 56: Structure removal ( dog waste station)
Lot 57: Structure removal ( trash receptacle)
Lot 58: Structure removal ( tree)
Lot 59: Structure removal ( picnic table)
Lot 60: Structure removal ( bench)
Lot 61: Structure removal ( park rules sign)
Lot 62: Structure removal ( post and cable fence)
Lot 63: Structure removal ( playground) ( h. C. Schilling park)
Lot 64: Structure removal ( splash pad)
Lot 65: Sidewalk removal
Lot 66: Curb and gutter removal
Lot 67: Concrete flume crossing
Lot 68: Concrete sidewalk
Lot 69: Temporary silt fence
Lot 70: Solid slab sodding
Lot 71: Accessible 8' table and 5' benches
Lot 72: 6' surface mount bench
Lot 73: 6' surface mount table and benches
Lot 74: Shade structure ( 20' x 20' square pavilion)
Lot 75: Accessible parking sign
Lot 76: Park rules sign
Lot 77: Okc spraygrounds sign
Lot 78: 12' pipe and rail gate
Lot 79: Pipe and rail fence
Lot 80: Backstop
Lot 81: Removal ( gravel)
Lot 82: Playground & surfacing ( complete in place) ( h. C. Schilling park)
Lot 83: Splash pad ( complete in place) ( h. C. Schilling park)
Lot 84: Community park sign ( complete in place) ( h. C. Schilling park)
Lot 85: Tree protection fencing
Lot 86: Dog waste station
Lot 87: Maintenance crossing
Lot 88: Earthwork ( h. C. Schilling park)
Lot 89: Description UOM Qty 812. B
Lot 90: Sidewalk removal
Lot 91: Concrete sidewalk
Lot 92: Solid slab sodding
Lot 93: Maintenance crossing
Lot 94: Description UOM Qty SPEC10
Lot 95: Solar light
Lot 96: Description UOM Qty SPEC14
Lot 97: Pipe and rail fence
Lot 98: Description UOM Qty 204. A
Lot 99: Clearing and grubbing
Lot 100: High density polyethylene ( hdpe) pipe ( 12")
Lot 101: Construction staking ( construction survey)
Lot 102: Mobilization ( sp)
Lot 103: Structure removal ( picnic table)
Lot 104: Structure removal ( bench)
Lot 105: Structure removal ( park rules sign)
Lot 106: Sidewalk removal
Lot 107: Concrete sidewalk
Lot 108: Curb and gutter
Lot 109: Temporary silt fence
Lot 110: Solid slab sodding
Lot 111: 6' surface mount bench
Lot 112: Park rules sign
Lot 113: Post tension concrete slab
Lot 114: Playground & surfacing ( complete in place) ( may park)
Lot 115: Tree protection fencing
Lot 116: Ada ramp
Lot 117: Maintenance crossing
Lot 118: Earthwork ( may park)
Lot 119: Description UOM Qty 823. A
Lot 120: Concrete sidewalk
Lot 121: Solid slab sodding
Lot 122: Accessible 8' table and 5' benches
Lot 123: 6' surface mount table and benches
Lot 124: Shade structure ( 20' x 20' square pavilion)
Lot 125: Description UOM Qty SPEC13
Lot 126: 12' pipe and rail gate
Lot 127: Description UOM Qty SPEC14
Lot 128: Pipe and rail fence
Lot 129: Description UOM Qty SPEC56
Lot 130: Basketball/futsol court surface coating & equipment ( complete in place) ( may park)
Lot 131: Description UOM Qty SPEC61
Lot 132: Neighborhood park sign ( complete in place) ( may park)
Lot 133: Description UOM Qty
Lot 134: Clearing and grubbing
Lot 135: Fog seal
Lot 136: Construction staking ( construction survey)
Lot 137: Mobilization ( sp)
Lot 138: Structure removal ( bollard)
Lot 139: Structure removal ( tree)
Lot 140: Sidewalk removal
Lot 141: Concrete sidewalk
Lot 142: Temporary silt fence
Lot 143: Temporary rock filter dam
Lot 144: Solid slab sodding
Lot 145: Accessible 8' table and 5' benches
Lot 146: 6' surface mount bench
Lot 147: 6' surface mount table and benches
Lot 148: Shade structure ( 20' x 20' square pavilion)
Lot 149: 6' surface mount backless bench
Lot 150: Park rules sign
Lot 151: 12' pipe and rail gate
Lot 152: Pipe and rail fence
Lot 153: Barbecue grill
Lot 154: Post tension concrete slab w/10' chainlink fence
Lot 155: Fitness station ( complete in place) ( oliver park)
Lot 156: Neighborhood park sign ( complete in place) ( oliver park)
Lot 157: Tree protection fencing
Lot 158: Ada ramp
Lot 159: Maintenance crossing
Lot 160: Earthwork ( oliver park)
Lot 161: Description UOM Qty 823. A
Lot 162: Concrete sidewalk
Lot 163: Description UOM Qty ****
Lot 164: Trees ( autumn flame red maple acer rubrum)
Lot 165: Trees ( shumard oak quercus shumardii)
Lot 166: Description UOM Qty SPEC10
Lot 167: Solar light
Lot 168: Description UOM Qty SPEC13
Lot 169: 12' pipe and rail gate
Lot 170: Pipe and rail fence
Lot 171: Description UOM Qty SPEC53
Lot 172: Basketball/pickleball surface coating & equipment ( complete in place) ( oliver park)
Lot 173: Description UOM Qty
Lot 174: Clearing and grubbing
Lot 175: Construction staking ( construction survey)
Lot 176: Mobilization ( sp)
Lot 177: Structure removal ( shade structure)
Lot 178: Structure removal ( backstop)
Lot 179: Structure removal ( bollard)
Lot 180: Structure removal ( trash receptacle)
Lot 181: Structure removal ( picnic table)
Lot 182: Structure removal ( park sign)
Lot 183: Structure removal ( bench)
Lot 184: Structure removal ( playground) ( shallowbrook park)
Lot 185: Sidewalk removal
Lot 186: Concrete sidewalk
Lot 187: Temporary silt fence
Lot 188: Solid slab sodding
Lot 189: Accessible 8' table and 5' benches
Lot 190: 6' surface mount bench
Lot 191: 6' surface mount table and benches
Lot 192: Shade structure ( 20' x 20' square pavilion)
Lot 193: Park rules sign
Lot 194: 12' pipe and rail gate
Lot 195: Pipe and rail fence
Lot 196: Backstop
Lot 197: Post tension concrete slab w/10' chainlink fence
Lot 198: Playground & surfacing ( complete in place) ( shallowbrook park)
Lot 199: Neighborhood park sign ( complete in place) ( shallowbrook)
Lot 200: Tree protection fencing
Lot 201: Earthwork ( shallowbrook park)
Lot 202: Description UOM Qty 812. B
Lot 203: Sidewalk removal
Lot 204: Concrete sidewalk
Lot 205: Solid slab sodding
Lot 206: Maintenance crossing
Lot 207: Description UOM Qty ****
Lot 208: Trees ( autumn flame red maple acer rubrum)
Lot 209: Trees ( shumard oak quercus shumardii)
Lot 210: Trees ( lacebark elm ulmus parvifolia)
Lot 211: Description UOM Qty SPEC38
Lot 212: No- mow natural area
Lot 213: Description UOM Qty SPEC57
Lot 214: Basketball/futsol court surface coating & equipment ( complete in place) ( shallowbrook park)
Lot 215: Description UOM Qty
Lot 216: Clearing and grubbing
Lot 217: Construction staking ( construction survey)
Lot 218: Mobilization ( sp)
Lot 219: Structure removal ( picnic table)
Lot 220: Structure removal ( park sign)
Lot 221: Structure removal ( bench)
Lot 222: Structure removal ( playground) youngs park)
Lot 223: Structure removal ( splash pad)
Lot 224: Sidewalk removal
Lot 225: Concrete sidewalk
Lot 226: Temporary silt fence
Lot 227: Solid slab sodding
Lot 228: Accessible 8' table and 5' benches
Lot 229: 6' surface mount bench
Lot 230: 6' surface mount table and benches
Lot 231: Park rules sign
Lot 232: Okc spraygrounds sign
Lot 233: Playground & surfacing ( complete in place) ( youngs park)
Lot 234: Splash pad ( complete in place) ( youngs park)
Lot 235: Neighborhood park sign ( complete in place) ( youngs park)
Lot 236: Tree protection fencing
Lot 237: Maintenance crossing
Lot 238: Earthwork ( youngs park)
Lot 239: Description UOM Qty SPEC10
Lot 240: Solar light
Lot 241: Description UOM Qty SPEC13
Lot 242: 12' pipe and rail gate
Lot 243: Pipe and rail fence
Lot 244: Description UOM Qty
Lot 245: Clearing and grubbing
Lot 246: Traffic stripe ( plural- component) ( 24" wide)
Lot 247: Construction staking ( construction survey)
Lot 248: Mobilization ( sp)
Lot 249: Structure removal ( tree)
Lot 250: Structure removal ( post and cable fence)
Lot 251: Structure removal ( guardrail)
Lot 252: Curb and gutter removal
Lot 253: Concrete sidewalk
Lot 254: Temporary silt fence
Lot 255: Solid slab sodding
Lot 256: Accessible 8' table and 5' benches
Lot 257: 6' surface mount bench
Lot 258: 6' surface mount table and benches
Lot 259: Shade structure ( 20' x 20' square pavilion)
Lot 260: Park rules sign
Lot 261: 12' pipe and rail gate
Lot 262: Pipe and rail fence
Lot 263: Post tension concrete slab
Lot 264: Removal ( gravel)
Lot 265: Playground & surfacing ( complete in place) ( zurline park)
Lot 266: Tree protection fencing
Lot 267: Ada ramp
Lot 268: Maintenance crossing
Lot 269: Pedestrian bridge ( complete in place) ( zurline park)
Lot 270: Earthwork ( zurline park)
Lot 271: Description UOM Qty SPEC58
Lot 272: Basketball/futsol court surface coating & equipment ( complete in place) ( zurline park)
Lot 273: Description UOM Qty SPEC64
Lot 274: Neighborhood park sign ( complete in place) ( zurline park)