08/11/2025 - USA | ME
RFP - Municipal Building Boiler - Town of Farmington - - The Town of Farmington is requesting proposals for the replacement of the existing boiler system at the Wastewater Treatment Plant, located at 269 Farmington Falls Road. The successful bidder will be responsible for the removal of all non- essential material and disposal of the replaced system and accessories, including all piping, insulation, valves, plumbing, electrical, and any and all concrete work where necessary. Single Boiler Proposal is to rep
RFP Municipal Building Boiler - Town of Farmington Replacement of the existing boiler system at the wastewater treatment plant, located at 269 Farmington Falls Road. The successful bidder will be responsible for the removal of all non- essential material and disposal of the replaced system and accessories, including all piping, insulation, valves, plumbing, electrical, and any and all concrete work where necessary. Single boiler proposal is to replace Veissman wall hung boiler with a commercial purepro trio oil boiler, or equivalent cast iron boiler of high efficiency rating. Boiler package shall include listed or equivalent: trio 547k BTU 9 section boiler, riello burner, boiler trim package, taco **** circulator, caleffi 548 hydro separator, all black iron fittings, pipe, nipples and ball valves to connect to existing feed and return manifolds. All required hangers and fasteners, 330 gallon vertical oil tank package, oil line from tank to boiler, all automatic controls. Controls will monitor outside air tem
AI helper
The Town of Farmington is seeking proposals for the replacement of the existing boiler system at the wastewater treatment plant. Proposals must include a price for all listed materials, labor, and disposal and must be received by August 25, 2025, at 5:00 PM. Bidders must inspect the facility for asbestos-containing materials (ACM) and include a separate price for removal. The successful bidder will be responsible for coordinating all necessary disciplines to complete the project. The timeframe for completion will be negotiated in the contract, but if not completed by November 1, 2025, it will need to be pushed out to the spring of 2026. The successful bidder will be contacted the day following the proposal review. The town reserves the right to accept or reject any and all proposals.
Sealed proposals must be received on or by August 25, 2025 at 5:00 p. m.
The municipal building will be available for inspection between the hours of 6:30 a. m. and 2:30 p. m. , Monday through Friday. To schedule an appointment, please contact wastewater superintendent Joe Hartigan at 207 778 ****.