City Of Celina - TX
Fiber Installation - Phase 4 - The City of Celina ( City), is seeking proposals from qualified firms for the Construction of a fiber path between the Downtown WWTP and Legacy Hills WWTP. This path will connect multiple locations including Legacy Hills WWTP, Legacy Hills Lift Station, Willock Hills Lift Station, Downtown Center, Parks Administration, Southeast Pump Station, Shawnee Trail East and West Lift Stations, Morgan Lakes EST, and Public Works Administration. Estimated Construction Cost: $ 900, 000
fiber installation phase 4 1. 1 temporary traffic control 1. 2 police managed tc per day 1. 3 proof duct 1. 4 proof existing ground box 1. 5 **** handhole ground box 1. 6 horizontal directional bore 1. 7 open cut 1. 8 ground rod 1. 9 fiber markers for ug 1. 10 rr barrier free ramp 1. 11 street pavement potholing 1. 12 rr asphalt paving 1. 13 close out 2. 1 temporary traffic control 2. 2 police managed tc per day 2. 3 manage test 48 fc on reel 2. 4 manage test 288 fc on reel 2. 5 hanglash cable to strand 2. 6 slack in sno shoes 2. 7 hang splice enclosure wslack 2. 8 riser, guard boot 2. 9 new build messenger strand 2. 10 pull fiber cable in duct 2. 11 aerial fiber markers 2. 12 coil slack in handhole 2. 13 tree trimming 2. 14 install guy 2. 15 install guy guards 2. 16 bond strand 2. 17 screw anchor 2. 18 cch01u fiber drawer 2. 19 cch04u fiber drawer 2. 20 cch splice cassettes 2. 21 prep cable for splicing 2. 22 plp coyote dome buffer tube version 2. 23 fusion splice in enclosure each strand of fiber 2. 24
Bid Close Date: