City Of Santa Clarita
Transit Maintenance Facility Maintenance Floor Recoating This project is federally funded. The work of this project includes having approximately 12, 000 square feet of the existing floor coating completely removed to the subsurface concrete, coating the exposed concrete with builtin moisture control system, and applying a new high strength/high traffic epoxy coating with non- slip grit in the same incumbent pattern.
Bid Close Date:
Lot 4: Materials - Furnish and provide all epoxy coating materials, primers, aggregate, sealers, and other materials necessary to complete the floor recoating work in accordance with the Contract Documents.
Lot 1: Phase 1 - Surface Preparation and Epoxy Coating. Includes designated Phase 1 areas: Equipment Bay, Bay 4, Lead Counter, Back Hallway, and Pit 2.
Lot 2: Phase 2 - Surface Preparation and Epoxy Coating. Includes designated Phase 2 areas: Bays 1, 2, and 3.
Lot 3: Phase 3 - Surface Preparation and Epoxy Coating. Includes designated Phase 3 areas: Front Hallway, Tire Bay, and Pit 1.
Lot 4: Materials - Furnish and provide all epoxy coating materials, primers, aggregate, sealers, and other materials necessary to complete the floor recoating work in accordance with the Contract Documents.
Lot 5: Equipment - Provide all equipment necessary to complete the work, including shot blasting equipment, grinders, industrial vacuums, mixing/application equipment, and other required equipment.
Lot 6: Misc.