Husd - Hesperia Unified School District - CA
Bid ****- 002 - N- Wing Restroom Bldg Rehab - HHS
NORTHWING RESTROOM BUILDING REHAB PROJECT HESPERIA HIGH SCHOOL remove and replace joist floor 2x10 wblocking 16 oc remove and replace batt insulation 6 r19 unfaced batt remove and replace batt insulation 10 r30 unfaced batt remove and replace 58 mold resistant drywall hung, taped, floated ready for paint remove and replace fiberglass reinforced plastic frp paneling wtrim paint the walls and ceiling two coats in its entirety. dunn edwards **** sand dollar or equal paint door opening two coats per side. paint the existing womens restroom door and frame in their entirety. dunn edwards de ****, roxy brown or equal remove and replace sheathing plywood 34 treated detach reset exhaust fan detach reset light bar 2 lights detach reset smoke detector new cat 6 data line to the overhead smoke detector. detach reset ductwork hot or cold air 6 round install ceiling access door ceiling access panel. size to match what is currently installed. remove and replace 14 cement board remove and replace ceramic tile base remove a
Bid Close Date: