City Of Rock Island - IL
Hud Funds
Invitation to bid EDPL 1- 2026
roof replacement remove existing shingles from the roof down to the roof sheathing. check for excessively wide gaps inthe roof planking. the back side of the roof should be inspected for water damage. some framingmembers may need to be addressed once the roof has been stripped down. there may beappropriate and approved repairs at this time. preferred method would be to repair and install fromthe top side of the roof instead of tearing the ceilings down. this maybe cause the roof to be acomplete resheath. install that ice and snow guard in all of the valleys and lower edges of the roofline. this must cover 2 higher than the exterior plate line. approved water barrier over the remainroof sheathing. install new 2 style d roof edging throughout. install 35year architectural shingles ofthe homeowners choice. install a shingle over ridge vent following manufactures instruction. allowmaximum cut back of the ridge line for ventilation. install new plumbing flashing boots, extend theplumbing vents if less the 12 on th
Bid Close Date: