Commonwealth Of Kentucky - Facilities & Support Services - KY
RFB- 61- 27 DJJ Lake Cumberland YDC Kitchen & Generator Upgrad
Kitchen & Generator Upgrade Kitchen & generator upgrade for Lake Cumberland YDC facility, including removal and replacement of federal pacific switchgear, installation of standby emergency generator, and provision of new concrete for generator access and propane storage tank with bollard protection.
Bid Close Date:
Lot 1: ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded The Contractor shall provide all of the materials and perform all the work described in the Specifications and/or shown on the Drawings. The Federal Pacific Switchgear including panels, contractors and disconnects of the Lake Cumberland YDC Facility will be removed and replaced per the National Electrical Code. In addition, a standby emergency generator will be installed to provide backup power of the Old Weld Shop Building which serves power for the Sewage Treatment Plant. The Contractor shall provide new concrete for access to the Generator, as well as the Propane Storage Tank with concrete- filled pipe bollard protection. The Owners preferred daily work schedule shall be Monday- Friday 8 hour/day. There are no Contractor working days on Saturday- Sunday. A 48 hour notification is required for any outage of any existing utility including the Chilled Water and Heating Water Systems. Any damaged utility by the Contractor must be put back into service immediately.