Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this
line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on "
Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and
contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire
Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** The project is a full replacement of the marina. Each
dock, gangway, landside stairs/abutments, and associated utilities are to be demolished. The existing stiff arms and their foundations will remain. The stiff arms will be sanded, painted, and attached to the new marina. The western portion of the cove will be dredged to provide adequate depth for
Docks C, D, E, and F per the design drawings.
Docks G and H are to be relocated and reassembled for use as temporary
dock moorage during construction. The temporary moorage will provide 22 slips that are large enough to accommodate the largest houseboats currently occupying the existing marina. Electric will be provided for the temporary
dock. The temporary
dock is not a recreation
dock. Houseboat owners will move their boats to the temporary
dock, where they will remain throughout construction. Construction should be staged in a manner that permits 44 house boats to remain in the water with shore power. 22 houseboats will be moved to the temporary
dock by the houseboat owners. The other 22 should be able to remain at the marina will other demolition, dredging, and construction occur.