The contractor shall provide personnel and supervision for the deinstallation of Air Traffic Control (ATC) equipment from the existing tower and installation into a newly constructed tower at Hatch Stagefield, Fort Rucker, Alabama. This includes all required cabling and grounding per FAA STD019E and **** site survey is required at project startup to identify materials and plan the relocation. The contractor must develop management plans, maintain program schedules, action items, and financial accountability. A mandatory initial site survey is required, resulting in a Site Survey Report (SSR) and Project Concurrence Memorandum (PCM). Weekly meetings may be telephonic. The contractor shall procure, install, engineer, and modify services including the voice switch, radio racks, antennas, transmitters, receivers, audio recorder, wind instrument system, and UPS. Design, engineer, procure, and install four communications consoles. Acceptance testing will be verified and witnessed by a government representative. The contractor must develop material acquisition and subcontracting plans, utilizing the government supply system first. Subcontractors must adhere to similar requirements. A quality program compliant with ISO 9001:2008 is required, with a Quality Control Plan accepted within 30 days of award. The contractor must possess a secret clearance. Operations must comply with OSHA, EPA, and other federal regulatory bodies. Contractor personnel will travel to Fort Rucker, Alabama, with reimbursement guided by Joint Travel Regulations (JTR). Government-furnished items (GFE) will be provided. Hazardous materials used must not contain prohibited ozone-depleting chemicals or elements like perchloroethylene and trichloroethylene.
The bid notice does not explicitly state a specific delivery deadline for the services or equipment.
The bid notice does not specify the payment terms.
The bid notice does not mention warranty requirements.
The bid notice does not specify the award criterion.
The contractor shall possess, at a minimum, a secret clearance.
The bid notice does not detail any penalties.
An initial site survey will be required to identify the materials necessary to complete the equipment installation.
The bid notice does not require sample submission.
The bid notice does not specify a deadline for challenges or disputes.