USA | VA | FALLS CHURCH CITY COUNTY | FALLS CHURCH | 22040 Small City
Interior, Department Of The- U. S. Fish And Wildlife Service- Fws, Construction A/ E Team 3
Geomembrane Pond Liners
Nm dexter nfhtc pond liner 12b & 13b - nm dexter nfhtc pond liner 12b & 13b
INSTALL POND LINERS PONDS 12B AND 13B **** POND LINER 12B 1 LS **** POND LINER 13B 1 LS
AI helper
The contractor shall complete the work within 123 calendar days after receiving award, notice to proceed. The delivery date is ****.
The bid notice states that payment will be made by FWS, Construction AE Team. Electronic invoicing and payment requirements are through the U. S. Department of the Treasury's Invoice Processing Platform (IPP).
The bid notice specifies a 2-year warranty from the manufacturer/installer for materials and equipment, covering leaks or failures in materials and workmanship, excluding damage from harmful chemicals, severe weather, fire, earthquakes, floods, vandalism, or abuse.
The basis of award is Lowest Price Technically Acceptable (LPTA), considering construction approach, installation method, work plan, relevant experience, qualifications, and price.
The installer must be the manufacturer or approved by the manufacturer to install their products and have supervised the installation of a minimum of 5,000,000 square feet of flexible membrane liner, with seaming performed by an experienced joiner who has joined a minimum of 2,000,000 square feet.
The bid notice does not explicitly detail penalties, but mentions that failure to comply with requirements may result in contractual remedies.
A site visit will be held on **** at 10 AM Pacific Time at the Southwestern Native Aquatic Resources and Recovery Center: **** Hatchery Road Dexter, NM ****.
Samples are required, including at least one 12-inch seam length of factory-bonded sheets and one 12-inch seam length of field-bonded sheets, to be submitted for review and acceptance prior to installation.
Questions must be submitted in writing to ***@***. *. * no later than 10 AM Pacific Time on ****.
The bid notice does not explicitly detail disqualification risks, but failure to submit all required information prior to the closing of the solicitation will result in the quote not being considered for award.
Bid Close Date: