04/12/2025 - USA | NE | ADAMS COUNTY | HASTINGS | 68901 Small City
City Of Hastings - NE
WEC1 Fly Ash Silo Foundations/Paving HU 2025- 57
WEC 1 fly ash silo foundations and paving 1 mobilization l. s. 1 2 bonding and insurance l. s. 1 3 sawcut existing concrete driveway l. f. 95 4 remove existing pavement s. y. 124 5 remove existing storm sewer pipe l. f. 149 6 install storm drain yard basins ea. 4 7 install 8 storm sewer pipe including trenching and connection l. f. 263 to existing storm sewer 8 overexcavation c. y. 50 9 subgrade preparation s. y. 922 10 concrete pavement s. y. 922 11 concrete header block l. f. 45 12 thickened concrete edge l. f. 170 13 grind 6 curb to 2 drop curb l. f. 25 14 silo mat foundation ea. 1 15 tiein to existing precipitator ea. 2 16 pipe support spread footing and pedestals ea. 1 17 pipe bollards with concrete base and covers ea. 3 18 paving to silo foundation, header block, and pipe trench wall l. s. 1 19 earthwork and final grading l. s. 1 20 aggregate surfacing ton 149 for option 1 contractors 21 sales tax only sales tax on materials of the above items total
AI helper
The City of Hastings, Nebraska, is seeking bids for the construction of fly ash silo foundations and paving. Proposals are due Wednesday, May 7, 2025, at 1:30 PM. Bidders must be on the city's approved bidders list or submit a plan holders submittal form. Bid documents are available at the city hall and online. Each bid must be accompanied by a certified check or bid bond. The successful bidder will be required to furnish a performance bond within 10 days of the award. The city will consider timelines of completion of prior contracts, existing workload, and available manpower. Bidders must submit all required documents, including addendums (if any), in a sealed envelope. The city does not accept faxed or emailed bids. Exceptions to specifications must be clearly stated. The project completion date is July 25, 2025. Liquidated damages of **** per working day will be assessed for failure to meet the specified dates. Sales tax applies to materials. Option 1 contractors must separately state materials, sales tax, labor, and other charges on all invoices. The city reserves the right to reject any or all proposals.