Dept Of Defense- Dept Of The Air Force- Air Combat Command- Fa4659 319 Cons Pk
Corrosion Protection
Protective Coatings Requirements Contract - Please see attached Sources Sought document.
sources sought protective coatings requirements contract the contractor shall perform both exterior and interior painting. the contractor shall paint walls, ceilings, concrete floors, exterior building surfaces, pavements, parking lot striping, airfield striping, parking ramp markings arrows, and fire hydrants install and repair wall coverings tape, bed, and texture walls. additionally, crosswalk maintenance and striping of street parking areas: streets, airfield, and parking lots shall be painted per contracting officers or project inspector directions.
Bid Close Date: