Transportation, Department Of- Federal Highway Administration- 690567 Western Federal Lands Div
Road Construction/ Roadway Excavation
ID FLAP ADA 2019( 1), Western Heritage Byway - Swan Falls Road - Task Order Contract Award notice for construction project, ID FLAP ADA 2019( 1), Western Heritage Byway - Swan Falls Road, SCHEDULE D. See the awarded bid tabulations posted under Attachments.
Construction of Western Heritage Byway - Swan Falls Road Mobilization, construction survey and staking, contractor quality control, contractor testing, construction schedule, soil erosion control fiber roll, watering for dust control, clearing and grubbing, removal of cattle guard, removal of gate, removal of restroom facility, removal of sign, removal of vault concrete tank, removal of fence, sawcutting pavement, roadway excavation, rock excavation, ditch excavation regrading, remove and reset boulder, placed riprap class 2, roadway aggregate method 2, roadway aggregate surface course 6 inch depth, asphalt concrete pavement, tack coat, fog seal, chip seal type 1c, emulsified asphalt, asphalt pavement milling 4 inch depth, cracks cleaning and sealing and filling, minor concrete pavement plain 6 inch depth, 12 inch pipe culvert, 18 inch pipe culvert, 24 inch pipe culvert, end section for 24 inch pipe culvert, cleaning culvert in place, wheelstop concrete, sidewalk concrete 6 inch depth, flowable backfill, catt