City Of Rockford - IL
Utility Work/ Water Main/ Utility Installation
Madison street reconstruction phase ii
Madison Street Reconstruction Phase II 15 units diameter unit 78 3 earth excavation cy **** 4 inlet and pipe protection ea 84 5 stabilized construction entrance sy 223 6 aggregate base course, type b, 6 ca2 sq yd **** 7 aggregate base course, type b, 6 ca6 sq yd **** 8 aggregate base course, type b, 8 ca6 sq yd **** 9 aggregate base course, type b, 12 ca6 sq yd 270 10 bituminous materials prime coat pound **** 11 bituminous materials tack coat pound **** hotmix asphalt binder course, il19. 0, 12 ton **** n90, 6 hotmix asphalt surface course, il9. 5, 13 ton **** mix d, n70, 2 14 longitudinal joint sealant foot 185 15 p. c. c. approach pavement, 8 inch sq yd 593 portland cement concrete sidewalk 4 16 sq ft **** inch 17 detectable warnings sq ft 710 18 pavement removal sq yd **** 19 hotmix asphalt surface removal, 2 sq yd **** 20 approach pavement removal sq yd 360 21 combination curb and gutter removal foot **** 22 sidewalk removal sq ft **** 23 storm sewer removal 8 foot 22 24 storm sewer removal 10 foot
Bid Close Date: