08/01/2025 - USA | MD | BALTIMORE CITY COUNTY | BALTIMORE
MULTI- DISCIPLINE ARCHITECT/ENGINEER SERVICES FOR MILITARY PROJECTS IN THE BALTIMORE DISTRICT, U. S. ARMY CORPS OF ENGINEERS - The purpose of this notice is to provide the Justification for Other than Full and Open Competition in accordance with FAR ****( a) for award of increase to the base contracts 39; ( **** to ****) capacity and extend the order
Modification to six single award task order contracts ( SATOCs) for architect- engineer ( AE) services, to extend the ordering period and increase capacity. preparation of full plans and specifications, preparation of design- build requests for proposal, construction cost estimating, site investigations, analysis, planning, master planning, national environmental policy act ( NEPA) documentation, programming ****, topographic and utility surveys, geotechnical investigations, storm water management design, sediment and erosion control plans, national pollutant discharge elimination system ( NPDES) permitting, charrettes, hazardous material investigations, building information modeling ( BIM), energy modeling, preparation of reports, studies, design criteria, design analysis documents, leadership in energy and environmental design ( LEED) documentation, value engineering, presentations, coordination with various government agencies and commissions, and other general AE services.
AI helper
Justification for modification to six single award task order contracts (SATOCs) for architect-engineer (AE) services to extend the ordering period and increase capacity. The modification is needed to bridge the gap until replacement contracts are awarded in Q2 FY2026. The existing AE firms have specialized experience and are the only responsible source for the services required, avoiding unacceptable delays and costs associated with a change of contractor. A notice of intent to increase capacity and extend the SATOCs was posted to SAM. gov. The increase in capacity is 90M.
The contracts were awarded based on qualifications, with the selected AE firms being the most highly qualified and the price schedules determined to be fair and reasonably priced.
The selected AE firms were the most highly qualified and the price schedules were determined to be fair and reasonably priced.