City Of Flowery Branch - GA
26- 004 Groundwater Wells 4 & 5
City of Flowery Branch Groundwater Wells 4 5 The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both city rightofway and property, as well as gdot rightsofway, including demolition, grading, drainage, and erosion control. Water main extensions will be installed using horizontal directional drilling hdd and opencut trenching methods. Work includes a 4inch dip hdd crossing 114 lf and abandonment of an existing 2inch main 103 lf within gdot rightofway. Approximately 1, 400 lf of new 8inch main will be installed along railroad street and cantrell road with tiein to cemetery road, and another 1, 000 lf of 8inch main will be added along vireo drive. Well head lines will range from 4 to 6inch dip and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12in
Bid Close Date: